Skip to content
IBC Recycling ServicesGet a quote
Industry · Construction & Municipal

Containers that get dropped, dragged and left in the mud.

Contractors and municipal yards are the least fussy and most practical customers we have. They do not care what colour the bottle is or whether the cage is scuffed. They care whether it holds a thousand gallons of water, survives a forklift driver in a hurry, and costs little enough that losing one is not a crisis.

Rugged used IBC totes staged outdoors for jobsite duty
Fig. 01Jobsite duty. Grade C, steel cage, and nobody minds a scuff.

Short answer

Buy grade C on steel cages. Fill brine and de-icer to weight, not to the line. We fabricate dust skids, wash bays and spray assemblies to order and take everything back at project end.
Typical grade
C
Cage
All-steel
Brine fill
~238 gal
Builds
To order
Form 01 · Spec request

Price a jobsite package.

Tell us the count, the duty and whether you need anything fabricated. Project-end collection can be quoted at the same time so the containers do not become somebody's problem in six months.

Letters only

Letters only

A working inbox — we reply here

US or Canada · 10 digits · (216) 987-6543

US state or Canadian province

US ZIP 44135 · Canada M5V 2T6

Whole number · totes, cages or loads

No phone number needed to reach us — we quote by email, usually within one business day. Your details are used only to price and schedule your totes.

Applications

What sites and yards use them for.

Construction and municipal applications
ApplicationGradeConfigurationNotes
Jobsite potable-adjacent waterFood gradeAny baseIf crews drink from it, buy documented stock
General site waterUsed CSteel cage preferredCheapest workable option
Dust suppressionUsed CSkid with pump and spray barFabricated to order
Concrete and equipment washUsed CStand with wand and sediment trapCapture runoff
Brine and liquid de-icerUsed BSteel cage, insulated or tracedFill to weight; 9.9 lb/gal
Ballast and barriersUsed CAnyFilled with water on site
Fuel-adjacent storageReconditionedViton gasketsCheck local regulation before storing fuel
Erosion and sediment control waterUsed CAnyOften paired with pumps
Fabrication

What the cage shop builds

  • Dust suppression skids with pump, hose reel and spray bar
  • Wash bays with wand, sediment trap and greywater capture
  • Insulated and heat-traced brine stations with metered draw-off
  • Welded stands and elevated frames for gravity feed
  • Forkable and strappable skid assemblies for frequent relocation
  • Storage cages from frames with the bottle removed

More examples on the upcycled builds page.

Site practice

What makes them last a season

  • Level, compacted standing — a full tote is over a ton and mud moves
  • Steel cages anywhere a forklift or loader operates
  • Drained below the outlet before a hard freeze, or heat traced
  • Spare valves and caps in the site container; they are what goes missing
  • Dedicated containers per fluid rather than rotating them between duties
  • Collection arranged at project end rather than left to the demobilisation rush
Questions

Construction and municipal, answered.

01Which grade suits a jobsite?
Grade C, almost always. A container that will be dragged, dropped and left in a mud lot gains nothing from cosmetic condition. Spend the saving on a steel cage instead.
02Why specify a steel cage?
Because jobsite handling is rough. All-steel bases and frames tolerate fork strikes, uneven ground and being moved by whatever equipment happens to be free, in a way composite bases do not.
03Can you build dust suppression and wash-bay units?
Yes. We fabricate skids, stands, spray bars, hose-reel assemblies and sediment traps in the cage shop, or supply the parts loose if your crew would rather build them.
04How do you handle brine and de-icer storage?
Brine at 9.9 pounds per gallon exceeds a 2,500 pound rating at about 238 gallons, so fill to weight. For winter service, insulated or heat-traced units on steel frames are the practical configuration.
05Do you take containers back at the end of a project?
Yes, and it is usually the right end to a project. We collect, pay for what has value and reclaim the rest, with a diversion statement if the contract requires one.
Jobsite specification

What survives a site, and what does not.

Construction and municipal containers are handled by whoever is free, on uneven ground, often in the cold. Specify for that.

Specification for site duty
ElementSpecifyAvoidWhy
GradeCACosmetics have no value; save the money
BaseAll-steelAll-plastic in winterPlastic gets brittle and takes fork strikes badly
CageSteel, straight barsAnything bowedIt will be moved by tractor and loader forks
BottleBlack UV-stabilisedNatural in full sunAlgae and long-term embrittlement
ValveFull-port ballButterfly for slurrySolids will not pass a disc
GasketEPDMViton unless fuelBrine and water are EPDM territory
CapVented for storageSolid on a warm fillPrevents bottle collapse
FittingCamlockBare buttressFast connect with gloves on
Fill capacity for winter and site fluids
FluidDensity275 gal max330 gal maxNote
Water8.34 lb/gal275 gal330 galFull in both
Brine, 23% NaCl9.9 lb/gal238 gal286 galMark the level on the cage
Magnesium chloride solution10.4 lb/gal226 gal273 galFill to weight
Calcium chloride, 32%11.1 lb/gal212 gal255 galFill to weight
Dust suppressant concentrate9.2 lb/gal256 gal308 galCheck compatibility
Diesel fuel7.1 lb/gal275 gal330 galCheck local storage rules
Winter operations

The failure that fills our spring intake.

Every April we buy containers from municipal yards that were fine in November. All of them were full of something when the temperature dropped.

  1. 01

    Drain before the freeze

    To below the outlet. Water expands, the bottle takes a permanent set and the cage bows outward at the mid-height bars. The container often still holds water and is no longer stackable or square.

    Costs nothing
  2. 02

    Open the valve

    Draining to below the outlet leaves water in the valve body, which freezes and can crack the housing or seize the disc. Thirty seconds, and it is the difference between a working valve in March and a replacement.

    Thirty seconds
  3. 03

    Insulate or trace if live

    For stations that must stay in service, insulate the tank, heat trace the manifold and keep water moving. A jacket alone slows freezing rather than preventing it.

    Modest cost
  4. 04

    Inspect in spring

    Check the cage is still square, the feet are true and the container sits level. Ten minutes at the end of the season keeps the same units working for a decade.

    Ten minutes
Jobsite applications and the right grade
ApplicationGradeBaseExtra requirement
Crew drinking waterFood gradePlastic or steelDocumented prior contents, no exceptions
General site waterUsed CSteel preferredNone
Dust suppressionUsed CSteelPump, hose reel, spray bar
Concrete and equipment washUsed CSteelSediment trap, runoff capture
Brine and liquid de-icerUsed BSteelInsulated or heat traced; fill to weight
Ballast and barriersUsed CAnyFilled on site
Erosion and sediment controlUsed CAnyOften paired with pumps
Fuel-adjacent storageReconditionedSteelViton gaskets; check local regulation
Extended FAQ · 6 questions

More questions, answered

01Which grade suits a jobsite?
Grade C, almost always. A container that will be dragged, dropped and left in a mud lot gains nothing from cosmetic condition. Spend the saving on a steel cage instead.
02Why specify a steel cage and base?
Because jobsite handling is rough and cold weather makes plastic brittle. All-steel bases and frames tolerate fork strikes, uneven ground and being moved by whatever equipment happens to be free.
03Can you build dust suppression and wash-bay units?
Yes. We fabricate skids, stands, spray bars, hose-reel assemblies and sediment traps in the cage shop, or supply the parts loose if your crew would rather build them.
04How do we store brine over winter?
Steel cage, level load-rated standing, insulation or heat tracing if the station stays live, and fill to weight — brine at 9.9 pounds per gallon caps a 2,500 pound container at about 238 gallons.
05Do you take containers back at the end of a project?
Yes, and it is usually the right end to a project. Book the collection at the same time as the delivery and containers left at demobilisation become a payment instead of a disposal cost.
06Is a used container safe for crew drinking water?
Only documented food-grade stock. On every other jobsite duty grade C is the correct and honest answer, and we will say so — but not for anything anybody drinks.
Next step

Quote the collection with the delivery.

Containers left behind at demobilisation become somebody's disposal cost. Book the pickup at the same time as the drop and it becomes a payment instead.

Get a quote